Unleashing Power: China Surpasses Energy Storage Marker in 2024

2025-03-28
The China Energy Storage Alliance (CNESA) reports significant growth in energy storage capacity in 2024, with non-hydro storage leading the way and global demand for battery solutions increasing.

The prestigious circle of power producers under the umbrella of the China Energy Storage Alliance (CNESA) has shared noteworthy statistics from its 2024 Energy Storage account. The data illustrates the total installed energy storage capacity of an impressive 137.9GW, indicating a robust increase of 59.9% compared to the previous year.

 

Shift in the Tides: Non-Hydro storage Overtakes Pumped Hydro Storage


The radical change worth noting was the dominance of non-hydro energy storage, boasting a 78.3GW capacity, which outshone its pumped hydro storage counterpart for the first time in recorded history. As per the alliance's records, a relatively lower 58.5GW of pumped hydro storage was installed during the same period.

 

Furthermore, the installed capacity of non-hydro energy storage vastly developed in China, extending to 43.7GW for the year, marking a yearly doubling effect.

 

A Power Frost in December: The Month of Maximum Installations


Interestingly, December emerged as the definitive powerhouse month, with total installations reaching the peak at 13.0GW.

 

Power Duration Preferences: Most Installed Energy Projects


Concerning energy storing duration, projects with the potential to conserve energy for a 2–4-hour duration secured the top spot on the most-installed list. However, longer-lasting projects with a duration span extending beyond 4 hours were not far behind, presenting a substantial yearly increase of 45%.

 

Capacity Catalog: Projects in Operation versus Under-Construction


Operational projects mainly composed of those capable of delivering 10MW or less, with them comprising 64% of the total. However, planned or underbuild projects showcase a capacity between 100–500MW.

 

Momentum March: Over 180-100MW Projects Operational in 2024


The alliance proudly announced that over 180 colossal projects with a 100MW storage capacity were initiated and turned operational within 2024.

 

Provincial Powerhouses: Top 10 Provinces in Installed Capacity


When assessing the provincial performance, each of the top 10 provinces succeeded in exceeding an installed capacity of 1GWh. Xinjiang and Jiangsu emerged as the frontrunners, outclassing others in energy and power scale.

 

Battery Bonanza: Overseas Order Uptake in 2024


Battery manufacturers were fortunate to secure overseas orders surpassing 100GWh. Additionally, a noteworthy order volume of over 30GWh was achieved by the photovoltaic and energy storage players in the same year.

 

The orders comprised of:

 

  • Battery cells
  • Battery cabins
  • Power conversion solutions
  • Energy storage mechanisms
  • EPC, etc.


Lastly, China registered a significant achievement in 2024, deploying mega-orders adding up to 150GWh for international projects, based on the data currently available.


As the global demand for advanced energy storage systems continues to grow, companies like ACE Battery are poised to meet this rising need. With over 13 years of experience in providing cutting-edge residential and industrial energy storage solutions, ACE Battery offers customizable and scalable storage systems that cater to the unique needs of businesses worldwide. With our expertise in OEM/ODM services and a strong focus on high-capacity energy storage, ACE Battery is committed to driving the future of sustainable energy storage, helping industries worldwide meet their growing energy demands.

Share
Previous article
Next article
Contact Us for Your Energy Solution!

Our expert will reach you out if you have any questions!

Select...